GridHz

NESO system warning

Electricity Margin Notice, 5 October 2026

Issued 23:59 · 5 October 2026 · cancelled 15:51 on 6 October 2026

Status

Cancelled

Stated shortfall

1,880 MW

Notices published

5

What this means

An Electricity Margin Notice is NESO asking the market for more generation. It is a routine signal that the forecast spare capacity for a given period is thinner than the operator wants, not a warning that the lights are about to go out — margin notices are issued, met by the market, and cancelled.

For how margin notices work and what actually triggers them, see electricity margin notices, explained.

The notices, as published

5 October 2026 23:59

From : Power System Manager – NESO Electricity Control Centre

ELECTRICITY MARGIN NOTICE 

An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
 
For the period:
from 15:00 hrs to 23:00 hrs on Tuesday   06/10/2026  
             
There is a reduced system margin. System margin shortfall 1840 MW

The current contingency requirement is 700 MW.

750 MW of generation is excluded from the available system margin due to system constraints.

Maximum Generation Service may be instructed.

Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.

Suppliers please advise National Energy System Operator of any additional Demand Control available.

The situation will be reviewed again by National Energy System Operator at 07:00 hours and an update issued.

This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 23:55 hrs on 05/10/2026

Issued by William Ramsay NESO Electricity Control Centre

**************

Information Note:-
As the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.

6 October 2026 06:45

From : Power System Manager – NESO Electricity Control Centre

ELECTRICITY MARGIN NOTICE 

An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
 
For the period:
from 15:00 hrs to 23:00 hrs on Tuesday   06/10/2026  
             
There is a reduced system margin. System margin shortfall 1880 MW

The current contingency requirement is 660 MW.

700 MW of generation is excluded from the available system margin due to system constraints.

Maximum Generation Service may be instructed.

Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.

Suppliers please advise National Energy System Operator of any additional Demand Control available.

The situation will be reviewed again by National Energy System Operator at 12:00 hours and an update issued.

This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 06:45 hrs on 06/10/2026

Issued by William Ramsay NESO Electricity Control Centre

**************

Information Note:-
As the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.

6 October 2026 12:53

From : Power System Manager – NESO Electricity Control Centre

ELECTRICITY MARGIN NOTICE 

An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
 
For the period:
from 16:00 hrs to 23:00 hrs on Tuesday   06/10/2026  
             
There is a reduced system margin. System margin shortfall 679 MW

The current contingency requirement is 275 MW.

600 MW of generation is excluded from the available system margin due to system constraints.

Maximum Generation Service may be instructed.

Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.

Suppliers please advise National Energy System Operator of any additional Demand Control available.

The situation will be reviewed again by National Energy System Operator at 15:30 hours and an update issued.

This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 12:55 hrs on 06/10/2026

Issued by Power System Manager NESO Electricity Control Centre

**************

Information Note:-
As the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.

6 October 2026 14:16

From : Power System Manager – NESO Electricity Control Centre

ELECTRICITY MARGIN NOTICE 

An ELECTRICITY MARGIN NOTICE has been issued by the National Energy System Operator to encourage market actions to increase System Margins.
 
For the period:
from 16:00 hrs to 23:00 hrs on Tuesday   06/10/2026  
             
There is a reduced system margin. System margin shortfall 321 MW

The current contingency requirement is 275 MW.

600 MW of generation is excluded from the available system margin due to system constraints.

Maximum Generation Service may be instructed.

Trading Points, Control Points and Externally interconnected System Operators are requested to notify National Energy System Operator of any additional MW capacity.

Suppliers please advise National Energy System Operator of any additional Demand Control available.

The situation will be reviewed again by National Energy System Operator at 15:30 hours and an update issued.

This Notification of Issue of a GB Transmission System Warning - ELECTRICITY MARGIN NOTICE Issued at 14:15 hrs on 06/10/2026

Issued by Power System Manager NESO Electricity Control Centre

**************

Information Note:-
As the System Operator, National Energy System Operator are responsible for balancing the electricity system in the final hours before real-time. We have a number of routine tools we can use to help us do this, this toolkit includes ELECTRICITY MARGIN NOTICES. An ELECTRICITY MARGIN NOTICE is used to send a signal to the electricity market. It highlights that, in the short-term, we would like a greater safety cushion (margin) between power demand and available supply. It does not signal that blackouts are imminent or that there is not enough generation to meet current demand.

6 October 2026 15:51cancellation

From : Power System Manager – NESO Electricity Control Centre

NOTIFICATION CANCELLATION of GB TRANSMISSION SYSTEM WARNING 

The GB Transmission System Warning

ELECTRICITY MARGIN NOTICE

issued for the period from  16:00 hrs to 23:00 hrs on
Tuesday   06/10/2026 has been cancelled 

The following GB Transmission System Warnings remain in force
.
None
.


Notification Issued at 15:45 hrs on 06/10/2026
Issued by Power System Manager NESO Electricity Control Centre

Notice text is reproduced verbatim from NESO via the Elexon BMRS SYSWARN dataset. GridHz adds the grouping, timings and context above.

All grid events · GB inertia data · live dashboard